Build Smarter
Milenium Haus offers a smarter way to build.
Our wall, floor, and roof panels are manufactured with industrial precision and flat-packed for rapid installation.
This isn't prefab. It's precision framing engineered for speed, code compliance, and scalability.
Built to meet modern building standards, our wall panels arrive fully outfitted reducing trade coordination, improving energy performance, and eliminating costly delays.
Pre-installed windows, doors, and conduit pathways
Designed for all climate zones and building codes
Insulated, airtight, and fire-rated
Each floor panel is cut to spec, engineered for residential loads, and optimized for service access saving hours on rough-in and layout.
Structural load-bearing assemblies
Pre-routed for HVAC and plumbing
Compatible with slab or raised foundation systems
Our roof systems provide a complete shell solution weather-sealed, structurally sound, and ready for the final finish layer.
Includes engineered trusses and sheathing
Solar-ready, pre-cut, and sealed for immediate dry-in
Built for fast assembly and long-term resilience
Built for Performance,
Ready to Install
Every system is factory-built and clearly labeled for fast, accurate installation.
Panels are tested for energy efficiency, acoustic performance, and fire safety—engineered to perform in both single- and multi-story structures.
Randek Robotics.
CNC Accuracy. Zero Guesswork.
Every system is factory-built and clearly labeled for fast, accurate installation.
Panels are tested for energy efficiency, acoustic performance, and fire safety engineered to perform in both single- and multi-story structures.

60% Faster Construction Timelines
Accelerate projects without sacrificing quality.

30% Less Material Waste
Cut costs and reduce environmental impact through precision manufacturing.

100% Made in California
Shorter lead times, better oversight, and reduced transport emissions.
Invest in
Scalable Housing
Discover more Info
Our California facility launches in 2026 with a scalable, robotic panel line and the capacity to produce 50–100 kits/month.